Wednesday, October 26, 2011

North Narberth Avenue Bridge

Repairs to the bridge will begin on Monday, October 31st.  During the repair phase, pedestrians will be asked to use the center of the bridge as a walkway instead of the walkways on either side of the bridge.  Vehicular traffic will still be prohibited.  The repair work should take about 10 days.